LPG Cylinder Production is composed of several sheet metal forming, surface treatment and testing processes. The process starts
with blanking, deep drawing and piercing, trimming and joggling. Next are the welding operations for valve boss, valve guard ring,
foot ring and the two halves. The finished cylinder is then heat treated, tested, shot blasted, painted and then the valve is
attached and final tested.
The main process steps are summarized below
2.1 LPG Cylinder Body Forming Line
2.2 LPG Cylinder Trimming & Beading
2.3 LPG Cylinder Guard Ring Production Line
2.4 LPG Cylinder Bottom Ring Production Line
2.5 LPG Cylinder Welding Line
2.6 LPG Cylinder Quality Controls
2.7 LPG Cylinder Heat Treatment Furnace
2.8 LPG Cylinder Shot Blasting
2.9 LPG Cylinder Metallization Line
2.10 LPG Cylinder Painting Line
2.11 LPG Cylinder Testing Line
1
|
Semi Auto
|
1000 cylinder/8hrs
|
1 set
|
4 months
|
2
|
Semi Auto
|
2000 cylinder/8hrs
|
1 set
|
4 months
|
3
|
Full Auto
|
1000 cylinder/8hrs
|
1 set
|
4 months
|
4
|
Full Auto
|
2000 cylinder/8hrs
|
1 set
|
4 months
|
We keep improving our machine technology all the time, our machines helped a lof of gas cylinder factories improve their production and gas cylinder quality with bigger capacity and much lower costing. For your better understanding, I am listing as follows:
1. Cylinder body auto making line, from decoiler to deep drawing, jogging and circle welding.
A: Fully automatic + Robots Auto feeding
B: 1000pcs/ 2000pcs Capacity as your needs
C:Only need max 3-5 people (only for change welding wires/ nozzels)
D:Video/ laser tracking +Patent Panasonic Welder
E: Workshop Land Saving, Cutting/ jogging/polishing in one machiLPG Cylinder Body Forming Welding Line
Welding is the most critical part of the production line, which engages the best cylinder performance and assures the good quality. Our welding machinery is the best cylinder & pressure vessel welding equipment in China and also TOP Ranked worldwide.
Full-auto welding machine includes socket welding, handle/collar welding, base ring welding, circumference welding, and all machines work automatically, the cylinder halves are conveyed by mechancial arm and chain, this system really saves much labor cost and improve the working efficiency apparently.
In order to relive all the stresses caused by forming and welding operations, the cylinders are passed through a heat treatment furnace where they are exposed to 930 º C degrees of temperature for certain time before getting cooled gradually.
After the tare weighing and marking of the cylinders, the valves are attached by automatic torque controlled screwing machines and tested against any leakage at the valve region by the pneumatic leakage testing machine of the finishing line.
One of the batch type quality control equipment called by the international standards is the burst expansion testing unit where the volumetric expansion ratio and the burst pressure is measured to the full satisfaction of even most stringent requirements.
Post time: Jun-27-2022