bgdh

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm for the long-term to create jointly with consumers for mutual reciprocity and mutual reward for Cryogenic Oxygen Storage Tanks, Nitrogen Dewar Tank, 5kg Lpg Gas Cylinder, We welcome new and previous clients from all walks of lifetime to get in touch with us for future small business interactions and mutual success!
Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng Detail:

Product Description

Product Description

A. Equipment brief introduction

Design and manufacture in accordance with the national standard GB/T9251-2011 “cylinder hydrostatic test method and GB 5842-2006″ liquefied petroleum gas cylinder “and so on.It’s main composed of water pressure testing machine, roller conveyer, hydraulic pneumatic system and control system, etc.

B. Characteristic and performance

1, This machine is suitable for LPG cylinder pressure testing, 12 station irrigation, water pressure testing, air pressure drainage step by step to complete.
2, This equipment adopts PLC control, can be realized automatic in the process of LPG cylinder pressure test, irrigation, suppressed, unloading, drainage, out of the bottle,, improving production efficiency.
3, Lower part is equipped with a roller conveyer, installation and use independently, also can be used for conveying line.In order to realize LPG cylinder pressure test process, irrigation, water pressure test, pressure continuous and efficient drainage.
4, Adopts the water pump for water supply, water tank, water can be recycled application.
5, Choosing effective suppression pump to ensure reliable of LPG cylinder pressure test.
6, This machine structure is reasonable, the operation is simple, safe, and convenient maintenance, low labor intensity, test quality standard.

C. Main technical data

Main technical data

1.Testing pressure:3.2MPa
2.Testing efficiency:250-260pcs/h
3.Air pressure:0.6-0.8 MPa
4, Water pressure cylinder model:QGSφ63×280MF1     12pcs
Drainage pressure cylinder model:QGSφ125×250MF1     12pcs
Limited cylinder model:QGSφ80×100MF2         3pcs
5, Pneumatic solenoid valve      12pcs
6, Voltage,Frequency: 3-phase   380V/50Hz
7,Special Suppression head  12pcs,High pressure pneumatic valve:12pcs,Ball check valves 12pcs,Exhaust valve 12pcs
8,Hydraulic test pump model:2DSY-400/10,
Power:3KW;
Volume:400L/h
Pressure:10MPa
9, Roller conveying speed:V=0-5m/s
10,Weight:5T

Machine Display

Machine Display (1)
Machine Display (2)

D. Structure and function

This machine is made up of  the hydraulic pressure testing machine, roller conveyer, hydraulic pneumatic system and control system.
1. The water pressure testing machine  is composed of frame, water pressure device, the holding device, drainage clamping device, water pump, hydraulic test pump, 1# limit ,2# limit, 3# limit , pneumatic hydraulic parts.Frame panel is equipped with 9 pressure gauge, one of them is precision pressure measuring instrument, used to check test pressure with pressure measuring instrument, the other eight were used to show the actual test pressure and air pressure after the adjustment.
2. The roller conveyer, driven by the motor reducer and gear transmission, to send gas cylinders to set position.
3. Hydraulic pneumatic system: the motor drives the water pump to supply water pressure testing machine, testing water after the compressed air pressure drainage recycling back into water tank.Compressed air through the pneumatic circuit applied to each cylinder, control cylinder action accordingly.
4. The operation control system: the control cabinet of the whole control system, the distribution of each control button on the control panel.Can be realized in the process of liquefied petroleum gas cylinder pressure test, irrigation, suppression, unloading, drainage, and out of the bottle, automatically.

Structure and function

E. Installation and debugging

1, According to the specific situation of the workshop, locate equipment installation (roller conveyer top high above the ground is 400 mm).

2. connecting power and gas source, checking the water pump, hydraulic test pump, drive

3.According to the relevant button, checking whether the parts movement is flexible.

4.Pushing and pull the hand control valve, check wheter the related parts operation is flexible.
5.Sequence of operation:
5.1 pulling out “limit 1″, “limit 2″, “limit 3″ hand control valve stem, “limit 1″, “limit 2″ “limit 3″ cylinder driving “limit 1″, send the cylinder to injection area (if transport too long, inching roller” reverse “button, adjustment in place, the same as below).
5.2 Each location of untest cylinders, starting the irrigation device button, water pressure device tightly sealed cylinder;
5.3 Pressure cylinders, open water pump 2 “and” limit 3 “in the peak;
5.4 Roller forward button, irrigation for the cylinder;
5.5 After cylinders filled with water, the water pump automatically shut down;.
5.6 Water pressure device automatically loosen cylinders;
5.7 Reset “limit 1″ hand control valve rod, cylinder “limit 1″ reset drive the stop lever down;
5.8 Starting conveyor line, sending the cylinders to the holding area;
5.9 Special crackdown on joint tightening up one by one,holding device sealing cylinder, faster plug with a high-pressure hose;
5.10 Starting testing pump, inlet valve open first for pressure pipe irrigation (also called a secondary irrigation water), water inlet valve and exhaust valve automatically shut down after the expiration of the water (secondary irrigation time controlled by time relay KT1, generally for 10 seconds or so), at the same time,high pressure testing pump open, up to 3.2 MPa after electric contact pressure gauge, pressure valve (8) closed at the same time, the holding 1 ~ 3 min (the holding time is controlled by time relay KT2).The holding time, (8 pcs) the pressure control valve and exhaust valve opening pressure relief at the same time;If the pressure valve and exhaust valve cannot open pressure relief, alarm, manual unloading.
5.11 One by one quickly remove the high pressure hose, then spiral out them one by one on joint;
5.12 Insert the drain;
5.13 Starting the drainage device button, the drainage pressure device tightly sealed cylinder;
5.14 Pulling out “inlet” hand control valve stem, compressed air into the cylinders, intake and drainage;
5.15 Gas cylinders after completion of drainage, drainage clamping device loosen cylinders;
5.16 Reset “limit 2″ hand control valve rod, cylinder “limit 2″ reset drive the stop lever down;
5.17 Starting the conveyor line, send the  tested cylinders to the drainage station, behind a batch of cylinders and following up, when checked the cylinder base hit “limit 3″ stop lever, conveyor line stop, remove checked cylinders, to complete a working cycle.

working cycle

Note

1. The functions of two pcs of time relays
1.1 KT1 time relay is specially used to control the secondary watering time (i.e. the opening interval time of the water supply valve and the pressure test pump).
1.2 KT2 time relay is used to control the pressure holding time.
2. “Limit 1″ and “Limit 2″ cylinders are at the working status only when it starts up to work (i.e. it is at working status).
3. Adjust the steel cylinder to the determined position:
3.1 The lower structures of watering and draining out compact units have the forced positioning function, which can remove the error on a certain range.
3.2 There is two pcs of guard rails at rear and front of machine so that the cylinder goes ahead without deviation.

F. Matter Need Attention

1. Ensure the power supply and the gas supply smooth, prohibit to drive the motor in reversal so as to damage the components.
2. We prepare the 2-2.5M3 compression air storage tank to ensure the gas supply pressure 0.5-0.6Mpa. The main pipe and its interface of air inlet pipe should be more than G1″, ensure the gas supply flowing volume is enough.
3. Keep water clear in water tank, without any dirty, without any float sundries. If there is, remove the float drifting sundries, in case it blocks the pipeline and effect the normal test.
4. Add 20# machinery oil onto the standard level for reducer, often check it.
5. Before shift over, pls press the “stop” button, cut off the power supply and gas supply.
6. There is safety protection for earthing in machine.
7. If you find there is abnormal on the indication of pressure-proof test actual pressure measuring meter when you start up the first batch gas cylinder testing every day, please calibrate it by the precision pressure measuring meter.
8. When equipment runs normally, pls close tightly the valve access to the precision pressure measuring meter (i.e. the calibration valve, also named as pressure meter switch).

Matter Need Attention

G.Maintenance

1. Add 20# machinery oil to lubricate the both side sliding blocks of pressure test pump for each shift. Add the 20# machinery oil into the reducer tank and the driving reducer meeting to requirement. After 36 hours, change one time. Then change oil one time for each 500 hours.
2. Ensure the equipment is clear without any dirty. If the pressure test pump is not used for long term, pls add the anti-corrosion water. After 3~5 minutes when start up machine, pls drain out the water storage in pipe of machine.
3. Pls add the 22# steam machinery oil into the triple oil forge device, and clean up the air filtration water piling. Add the oil into the roller table both side bearings twice for each working shift, ensure its lubrication.
4. Calibrate the pressure meter as stipulation.

More Products

More Products

Semi-auto hydro testing machine

Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.

FAQ for LPG cylinder hydro testing machine

Q: What size of LPG cylinder your machine can test?

A: 6kg, 12kg,15kgs and 50kgs LPG cylinder for cooking and other size according customers’ requirement.

Q: Can you design machines according LPG cylinder technical drawing?

A: Sure, please send your technical drawing to us.

Q: What are the benefits to choose your machines?

A: Our machines are strong and reliable for long term industrial manufacturing

To enable me give you correct proposal for correct machines, please tell me following details:
We need to know following information to quote you correct machineries:

1.Technical Drawing of the cylinders you want to test?
2.How many pcs you want to test per 8hrs


Product detail pictures:

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng detail pictures

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng detail pictures

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng detail pictures

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng detail pictures

Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng detail pictures


Related Product Guide:

We provide fantastic energy in top quality and advancement,merchandising,gross sales and marketing and operation for Good Quality Lpg Gas Cylinders For Sale - Automatic Hydro-static Testing LPG Gas Cylinder Water Pressure Machine – Hansheng , The product will supply to all over the world, such as: Qatar, Colombia, Seattle, Our main objectives are to provide our customers worldwide with good quality, competitive price, satisfied delivery and excellent services. Customer satisfaction is our main goal. We welcome you to visit our showroom and office. We are looking forward to establish business relation with you.
  • We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Mike from Argentina - 2018.12.28 15:18
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Agnes from Bolivia - 2018.09.23 18:44

    Send your message to us:

    Write your message here and send it to us