bgdh

55 Gallon Standard Tight Head Steel Drum Drying Room

55 Gallon Standard Tight Head Steel Drum Drying Room

Short Description:

Workpiece size: 20lb 305*447 mm

Use abrasive: 0.8~1.2 (steel cut shot)

.Steel surface roughness: Ra12.5-50 m

Noise level: <95dB(A)


Product Detail

Product Tags

Product Description

Our internal caps spraying drying room is a special equipment for spraying and baking the 200/210 liter steel barrel cover. It is mainly conveyed by the front roller conveyor, the preheating surface drying tunnel, the front belt conveyor, the forward cover distribution device, the drying room body, the front air exhaust device, the heating chamber part, the main conveyor chain system of the barrel cover, the rear air exhaust device, and the cooling device. , Rear reeling device, main drive chain pneumatic tensioning device, flip device, rear roller conveyor, electrical control system and other parts. (See attached picture for details)

steel drum oven room 2 (3)

Vertical shot blasting machine, connected with powder spraying line conveyor chain; efficiency 1300PCS/8HThis machine is a special shot blasting machine for liquefied gas cylinders. With the help of the high-speed pill stream ejected by the multifunctional high-efficiency shot blasting device, it hits the surface of the liquefied gas cylinder and achieves the effect of shot blasting to remove the oxide scale, so that the surface of the cylinder is silver-gray, and it has the effect of eliminating stress and improving the adhesion of the surface coating. ; The shot blasting process can also be used to increase the surface pre-compression stress of the above-mentioned workpiece, improve the fatigue strength, and achieve the purpose of shot blasting.

Purpose of the equipment

*The baking oven is specially used for baking the inner surface coating and outer wall coating of the steel drum.

*Any other use is deemed not to be in accordance with the prescribed use.

*Our Company is not responsible for any loss caused thereby.

*All materials used (eg: sheet metal, paint, solvents, etc.) must meet the requirements listed in the material supplier's instructions.

*Must comply with the maximum value of the maximum volatilization of the solvent specified by the oven.

steel drum oven room 2 (1)

Main technical parameters

2.1 Maximum production capacity: 600 pieces/hour;

2.2 Maximum working temperature: 270℃;

2.3 Drying time: 20min

2.4 Length of preheating surface drying drying tunnel: 7000mm;

2.5 Length of drying tunnel: 10000mm;

2.6 Cooling length: 3510mm;

2.7 Specification of barrel cover: Ф560~610mm

2.8 Applicable barrel cover monomer weight: 4kg;

2.9 Total equipment power: 60KW

2.10 Power supply: 3*380V, 50HZ (special power supply is based on the local power supply standard of the customer);

2.11 Control power supply: 220V, 50HZ;

2.12 Maximum solvent volatilization: 30kg/h;

2.13 Heating energy: applicable to electricity, kerosene, diesel, natural gas, city gas, liquefied petroleum gas and coal-fired hot blast stove.

steel drum oven room 2 (2)

FAQ

To enable me send you offer for correct machines, please tell me following details:

A: Technical drawing

B: Size of the steel drum you want to manufacture

C: What's the capacity per shift/day?


  • Previous:
  • Next:

  • Send your message to us:

    Write your message here and send it to us